Transforming Ideas Into Reality

Delivering Projects Faster & Smarter

HGM offers technologically advanced, end-to-end solutions for a wide range of complex projects. Innovation defines the way we work, creating lasting and integrated solutions for our clients, delivering enduring value across the entire project lifecycle. We strive to add value at every point in order to contribute to better outcomes for our clients and for the environment.

HGM brings its wealth of know-how gained from dealing with Israel’s extreme water challenges, for the benefit of international projects in Africa, Asia and Latin America.
Bringing together the best in global and local expertise, HGM can meet specific site and client requirements for any project, in any environment.

Nir Etzion

WWTP
Israel

Nir Etzion

WWTP
Israel
An on-going project. Detail design of WwTP with nutrient removal and aerobic and anaerobic sludge digestion. This project was designed in AutoCad 3D according to BIM standard.

Year: 2020

Ayalon WWTP

WWTP
Israel

Ayalon WWTP

WWTP
Israel
Ayalon WwTP Upgrading & Expansion. Project includes renovation of Primary Clarification, Biological reactors for Nutrient removal and secondary Clarifiers and a Tertiary Treatment for 81,000 cubic meters per day. Project also includes an extra Anaerobic Digester at a volume of 5,000 m3.

Year: 2013 - today

Beer Sheva WwTP

WWTP
Israel

Beer Sheva WwTP

WWTP
Israel
Fully BIM Standard design of 95,000 m3/day Beer Sheva WwTP.
Plant consist of pretreament Process, THP sludge process and Anaerobic Digesters.

Year: 2022 - today

Ashkelon WWTP

WWTP
Israel

Ashkelon WWTP

WWTP
Israel
Ashkelon WwTP was recently upgraded and extended to 40,000 m3/meter. The project included an additional detailed design for aerobic reactors for Nutrient removal, an extra secondary clarifier and a new gravitational sand filtration as a tertiary treatment. The plant is about to be extended to full population capacity of 75,000 m3/day.

Year: 2015

Drom Hasharon WWTP

WWTP
Israel

Drom Hasharon WWTP

WWTP
Israel
Drom Hasharon WwTP has been handled by H.G.M since the early stages, including conceptual and preliminary design, up to detailed design and supervision. The design included complete treatment of primary clarifiers, biological reactors for nutrient removal followed by secondary clarifiers and tertiary treatment. Sludge treatment included mechanical room for sludge and Anerobic reactors for digestion. Project Cost: 30M$.

Year: 2008 - 2019

Ashkelon Barnea Sewage Pumping station

Pumping stations
Israel

Ashkelon Barnea Sewage Pumping station

Pumping stations
Israel
Barnea pumping station is part of a very complex project that is located at the foot of the beautiful beach of Ashkelon. The station was built under a lookout point which was designed by architects. The station was designed and built with attention to detail due to considerations of proximity to the residential neighbourhood and the beach. PS capacity of about 250 m3/hr.

Malcom Park PS, Nassau Bahamas

Pumping stations
The Bahamas

Malcom Park PS, Nassau Bahamas

Pumping stations
The Bahamas
Dewatering of main PS during Construction close to the lagoon. Discharge of PS 1,750 m^3/hr.

Year: 2017

Ramat Hanegev , Southern District

Pumping stations
Israel

Ramat Hanegev , Southern District

Pumping stations
Israel
As part of the development of sewage pumping systems in the Negev, 5 sewage pumping stations were designed and built along a route of proximity 10 km in order to convey sewage from all the localities to the local WwTP. The pumping stations are designed for different flows and high pressure.

Southern District Beer Sheva

Sewers
Israel

Southern District Beer Sheva

Sewers
Israel
Preliminary and Detailed design of 1200 mm HDPE Main Sewer in the center of Beer Sheva, 3.6 Km long including two river crosses and Jack Piping in proximity to the fuel infrastructure.

Year: 2016 - today

Southern District Ofakim

Sewers
Israel

Southern District Ofakim

Sewers
Israel
Preliminary and Detailed design of 9 Km (5.6 miles) of 710 mm forcmain from the city of Ofakim to Beer Sheva WwTP. Forcemain includes HDD drilling crossing rivers. Also includes an upper piping (every 3 km) with control valves for operational purposes.

Year: 2016 - today

Dead Sea Forcmains

Sewers
Dead Sea Forcmains

Dead Sea Forcmains

Sewers
Dead Sea Forcmains
Water and sewerage networks along the western shore area. Dead Sea international beach.

Year: 2012 - 2015

Major Waterpipe Center of Tel Aviv

Water Supply
Israel

Major Waterpipe Center of Tel Aviv

Water Supply
Israel
Design and supervision of 710 mm water pipes forcemain in the center of Tel Aviv as part of the light train works.

Year: 2020

Ashdod - Water Pumping Station

Water Supply
Israel

Ashdod - Water Pumping Station

Water Supply
Israel
The project includes a 3000 m3 water reservoir and a high pressure pumping station, including a water chlorination system. Water will be supplied for Ashdod port, industrial areas and in the future for residential areas. The station has a capacity of 1600 m3/hr.

Year: 2012

Herzeliya Glil Yam

Hydrology & Storm Water Drainage
Israel

Herzeliya Glil Yam

Hydrology & Storm Water Drainage
Israel
Design of runoff water management and Harvesting systems from the Masterplan stage up to implementation. Designing collected rainwater in the winter months and utilizing it during summertime.

Year: 2016

Tel Mond Rainfall Outlet

Hydrology & Storm Water Drainage
Israel

Tel Mond Rainfall Outlet

Hydrology & Storm Water Drainage
Israel
Main Rainfall Outlet

Gezer River, Lod City

Hydrology & Storm Water Drainage
Israel

Gezer River, Lod City

Hydrology & Storm Water Drainage
Israel
Stream regulation and temporary Calvert in the Gezer River, Lod city.

Year: 2020

Ashkelon EcoSport Park

Recreational areas
Israel

Ashkelon EcoSport Park

Recreational areas
Israel
EcoSport Park in Ashkelon is a recreational park located near a residential neighborhood. Runoff water from the adjacent neighborhood is planned to flow into the park using Archimedean pumps. Additionally, a pressure filtration system for the lake water was established.

Beer Sheva Park Effluent lake

Recreational areas
Israel

Beer Sheva Park Effluent lake

Recreational areas
Israel
Planning and supervision of the construction of an artificial effluent lake in the heart of the Negev capital. The lake serves as a recreation area and is located in a central park in Beer Sheva.

Water Treatment Plant

Water resources development
Nigeria

Water Treatment Plant

Water resources development
Nigeria

Nassau Sewage Masterplan

Statutory consulting
The Bahamas

Nassau Sewage Masterplan

Statutory consulting
The Bahamas
Establishment of pumping and sewage treatment facilities following a sewage master plan made for the Bahamas.

Workshop meeting in Zimbabwe with the Chief water and sewage department on the location of a new WWTP in Harare

Year: 2018