Ashkelon BARNEA Sewage Pumping station
Barna pumping station is part of a very complex project that is located at the foot of the beautiful beach of Ashkelon. The station was built under ...
Barna pumping station is part of a very complex project that is located at the foot of the beautiful beach of Ashkelon. The station was built under ...
Drom Hasharon WwTP was handeled by H.G.M since early stages which included conceptual and prelaminary design, up to deatail design and supervision. The ...
Ashkelon WwTP was recently upgraded and extended to 40,000 m3/meter. The project included an additional detailed design for aerobic reactors for Nutrient ...
Ayalon WwTP Upgrading & Expansion. Project includes renovation of Primary Clarification, Biological reactors for Nutrient removal and secondary ...
An on-going project. Detail design of WwTP with nutrient removal and aerobic and anaerobic sludge digestion. This project was designed in AutoCad 3D ...