2021-January-06
Ramat Hanegev , Southern District
As part of the development of sewage pumping systems in the Negev, 5 sewage pumping stations were designed and built along a route of proximity 10 km in ...
As part of the development of sewage pumping systems in the Negev, 5 sewage pumping stations were designed and built along a route of proximity 10 km in ...
Dewatering of main PS during Construction close to the lagoon. Discharge of PS 1,750 m^3/hr. Year: 2017
Barna pumping station is part of a very complex project that is located at the foot of the beautiful beach of Ashkelon. The station was built under ...